1 Scope
2 Normative References
3 General Provisions
3.1 General Requirements
3.2 Basic Requirements for the Machine Train Construction
4 Preparations for Construction
4.1 Technical Preparations
4.2 Site Preparations
4.3 Unpacking Inspection
4.4 Foundation Inspection,Re-measurement and Surface Treatment
5 Overall Installation of the Machine Train
5.1 Installation of Supporting Plates and Shims
5.2 Installation of Baseplate in Position
5.3 Installation of the Machine Train in Position
5.4 Shaft End-to-end Distance Confirmation and Shaft Alignment
5.5 The Machine Train Grouting
5.6 Coupling Assembly
- APP免费
6 Gearbox Assembly
- APP免费
7 Axial Compressor Assembly
- APP免费
7.1 Assembling Procedure
- APP免费
7.2 Axial Compressor with Bearing House and Casing Separated
- APP免费
7.3 Axial Compressor with Bearing House and Casing Integrated
- APP免费
8 Assembly and Examination of Expander
- APP免费
8.1 Examination Prior to Expander Assembly
- APP免费
8.2 Assembly of Expander
- APP免费
9 Assembly of Motor/Generator
- APP免费
10 Auxiliary Facility and Piping Installation
- APP免费
10.1 Auxiliary Facility Installation
- APP免费
10.2 Piping Connection
- APP免费
10.3 Oil System Flushing
- APP免费
11 Running Test of the Machine Train
- APP免费
11.1 Preparations for Running Test
- APP免费
11.2 Running Test of Oil System
- APP免费
11.3 Mechanical Running Test of the Motor and Generator
- APP免费
11.4 Mechanical Running Test of Gearbox
- APP免费
11.5 Mechanical Running Test of Axial Compressor
- APP免费
11.6 Mechanical Running Test of Expander
- APP免费
12 Technical Documents of Construction Completion
- APP免费
Appendix A(Informative)Technical Characteristics of the Machine Train
- APP免费
Appendix B(Informative)Mono-indicator Alignment
- APP免费
B.1 Basic Procedures of Mono-indicator Alignment
- APP免费
B.2 Determination of Support Adjusting Quantity by Means of Graphing Method
- APP免费
B.3 Determination of Support Adjusting Quantity by Means of Calculation Method
- APP免费
Explanation of Wording in This Code
- APP免费
Explanation of Provisions
- APP免费
Revision Explanation
- APP免费
1 Scope
- APP免费
3 General Provisions
- APP免费
3.2 Basic Requirements for the Machine Train Construction
- APP免费
4 Preparations for Construction
- APP免费
4.1 Technical Preparations
- APP免费
4.2 Site Preparations
- APP免费
4.3 Unpacking Inspection
- APP免费
4.4 Foundation Inspection,Re-measurement and Surface Treatment
- APP免费
5 Overall Installation of the Machine Train
- APP免费
5.4 Shaft End-to-end Distance Confirmation and Shaft Alignment
- APP免费
6 Gearbox Assembly
- APP免费
7 Axial Compressor Assembly
- APP免费
7.1 Assembling Procedure
- APP免费
7.2 Axial Compressor with Bearing House and Casing Separated
- APP免费
8 Assembly and Examination of Expander
- APP免费
8.1 Examination Prior to Expander Assembly
- APP免费
8.2 Assembly of Expander
- APP免费
9 Assembly of Motor/Generator
- APP免费
10 Auxiliary Facility and Piping Installation
- APP免费
10.1 Auxiliary Facility Installation
- APP免费
11 Running Test of the Machine Train
- APP免费
11.1 Preparations for Running Test
- APP免费
11.3 Mechanical Running Test of the Motor and Generator
- APP免费
11.6 Mechanical Running Test of Expander
- APP免费
Appendix A(Informative)Technical Characteristics of the Machine Train