6.2 Quality Inspection and Assessment Scope for Maintenance Works
6.2.1 This section is applicable for construction quality inspection and assessment of maintenance works.The quality inspection and assessment scope mainly includes project No.,quality inspection item classification,acceptance organization and No.of the inspection standard.Table 6.2.1 shows quality inspection and assessment scope.
Table 6.2.1 Quality inspection and assessment scope for mechanical works
Table 6.2.1(Continued)
Table 6.2.1(Continued)
Table 6.2.1(Continued)
Table 6.2.1(Continued)
Table 6.2.1(Continued)
Table 6.2.1(Continued)
Table 6.2.1(Continued)
Table 6.2.1(Continued)
Table 6.2.1(Continued)
Table 6.2.1(Continued)
Table 6.2.1(Continued)
Table 6.2.1(Continued)
Table 6.2.1(Continued)
Table 6.2.1(Continued)
Table 6.2.1(Continued)
6.2.2 Mechanical works acceptance and assessment scope shall be classified according to the basic mode defined in the Table 6.2.1.Unit project,branch project,sub-item project and section project can be cut down according to the actual conditions of desulfurization project.If any project is added/cut down,numerical order of project number shall be maintained.