参考文献

[1]国家能源局.我国可再生能源发电装机达6.5亿千瓦,同比增14%[N].http://www.nea.gov.cn/2018-01/24/c_136920163.htm.

[2]国家能源局.2017年光伏发电新增装机5306万千瓦,居可再生能源之首[N].http://www.nea.gov.cn/2018-01/24/c_136920159.htm.

[3]肖创英,汪宁渤,陟晶,等.甘肃酒泉风电出力特性[J].电力系统自动化,2010,34(17):64-67.

[4]陈国平,李明节,许涛,等.关于新能源发展的技术瓶颈研究[J].中国电机工程学报,2017,37(1):20-26.

[5]舒印彪,张智刚,郭剑波,等.新能源消纳关键因素分析及解决措施研究[J].中国电机工程学报,2017,37(1):1-8.

[6]国家能源局.可再生能源发电量1.7万亿千瓦时,同比增1500亿千瓦时[N].http://www.nea.gov.cn/2018-01/24/c_136920162.htm.

[7]R Piwko,E Camm,A Ellis,et al.A whirl of activity[J].IEEE Power on Energy Magazine,2009,7(6):26-35.

[8]P Pourbeik.Specification of the second generation generic models for wind turbine generators[R].Palo Alto,Carlifornia,USA,2013.

[9]WECC Renewable Energy Modeling Task Force.Generic solar photovoltaic system dynamic simulation model specification[R].Salt Lake City,Utah,USA,2012.

[10]P Pourbeik.Technical Update-wind and solar PV modeling and model validation[R].Palo Alto,Carlifornia,USA,2012.

[11]North American Electric Reliability Corporation(NERC),Integration of Variable Generation Task Force(IVGTF)Task1-1.Standard models for variable generation[R].Princeton,USA,2010.

[12]B Badrzadeh,Vestas Technology R&D.Vestas on type 3 and 4 generaic wind turbine models(PPT)[R].Salt Lake City,Utah,USA,2011.

[13]L Lindgren,J Svensson,L Gertmar.Generic models for wind power plants:needs and previous work[R].Stockholm,Sweden,2012.

[14]P Pourbeik,A Ellis,J Sanchez-Gasca,et al.Generic stability models for type 3&4 wind turbine generators for WECC[C]//Power and Energy Society General Meeting(PES),Vancouver,British Columbia,Canada,2013.

[15]P Sørensen,B Andresen,J Fortmann.Modular structure of wind turbine models in IEC 61400-27-1[C]//Power and Energy Society General Meeting(PES),Vancouver,British Columbia,Canada,2013.

[16]North American Electric Reliability Corporation(NERC).Accommodating high levels of variable generation[R].Princeton,USA,2009.

[17]K Clark,N W Miller,J J Sanchez-Gasca.Modeling of GE wind turbine-generators for grid studies[R].Schenectady,USA,2010.

[18]K Clark,N W Miller,R Walling.Modeling of GE solar photovoltaic plants for grid studies[R].Schenectady,USA,2010.

[19]WECC Renewable Energy Modeling Task Force.WECC PV power plant dynamic modeling guide(draft posted for TSS approval)[R].Salt Lake City,Utah,USA,2014.

[20]WECC Renewable Energy Modeling Task Force.WECC wind power plant dynamic modeling guide[R].Salt Lake City,Utah,USA,2010.

[21]P Pourbeik.Technical update-generic models and model validation for wind turbine generators and photovoltaic generation[R].Palo Alto,Carlifornia,USA,2013.

[22]P Pourbeik.Proposed changes to the WECC WT4 generic model for type4 wind turbine generators[R].Palo Alto,Carlifornia,USA,2011.

[23]P Pourbeik.Proposed changes to the WECC WT3 generic model for type3 wind turbine generators[R].Palo Alto,Carlifornia,USA,2012.

[24]WECC Renewable Energy Modeling Task Force.Pseudo governor model for type 1 and 2 generic turbines[R]Salt Lake City,Utah,USA,2012.

[25]CIGRE Working Group C4.601.Modeling and dynamic behavior of wind generation as it relates to power system control and dynamic performance[R].Paris,France,2007.

[26]P Sørensen,B Andresen,J Fortmann,et al.Overview,status and outline of the new IEC 61400-27-electrical simulation models for wind power generation[C]//10th International Workshop on Large-Scale Integration of Wind Power into Power Systems as well as on Transmission Networks of Offshore Wind Power Plants.Aarhus,Denmark,2011.

[27]P Sørensen.IEC 61400-27 standard on electrical simulation model for wind power generator[R].Rome,Italy,2012.

[28]W Li,H Minhan,K Shunchin.Transient analysis of Jang-Bin wind farm connected to Taipower grid[C]//CACS International Automatic Control Conference,Sun Moon Lake,Taiwan,2013.

[29]L Yong,L Yilu,J R Gracia.Variable-speed wind generation control for frequency regulation in the eastern interconnection(EI)[C]//IEEE PES T&D Conference&Exposition,Chicago,USA,2014.

[30]N Modi,T K Saha.Revisiting damping performance of the Queensland network under wind power penetration[C]//Power and Energy Society General Meeting,San Diego,USA,2012.

[31]C A Chang,Y K Wu,W T Chen,et al.A novel power system defense plan to cope with 30%wind power penetration in the isolated Penghu system[J].IEEE Transactions on Industry Applications,2013,49(4):1669-1677.

[32]Yurry Kazachkov.PSS/E wind and solar models(PPT)[R].Rensselaer,New York,USA,2011.

[33]J J Sanchez-Gasca.Wind and solar models in PSLF(PPT)[R].St.Paul,MN,USA,2011.

[34]DIgSILENT Gmb H.DIgSILENT Power Factory User Manual_EN[R].Gomaringen Germany,2016.

[35]A Ellis,Y Kazachkov,E Muljadi,et al.Description and technical specifications for generic WTG models—a status report[C]//Power Systems Conference and Exposition(PSCE),Phoenix,AZ,USA,2011.

[36]N W Miller,J J Sanchez-Gasca,W W Price,et al.Dynamic modeling of GE 1.5 and 3.6MW wind turbine generator for stability simulations[C]//IEEE Power Engineering Society General Meeting,Toronto,Ontario,2003.

[37]N W Miller,W W Price,J J Sanchez-Gasca.Dynamic modeling of GE 1.5 and 3.6MW wind turbine-generators(Version 3.0)[R].Schenectady,USA,2003.

[38]IEC 61400-27-1 Wind turbines:Part 27-1 electrical simulation models for wind power generation[S].2012.

[39]R Ghazi,H Aliabadi.Stability improvement of wind farms with fixed-speed turbine generators using braking resistors[C]//Universities Power Engineering Conference(UPEC),Cardiff,Wales,2010.