- GB 50825-2013 钢铁厂加热炉工程质量验收规范 (英文版)
- 中国冶金建设协会
- 4字
- 2021-03-31 18:16:08
8 Evaporative Cooling System
8.1 General Requirements
8.1.1 The evaporative cooling system of the reheating furnace in the steel plant with the working pressure not higher than 4.0MPa shall comply with the requirements in this Chapter.
8.1.2 The evaporative cooling system engineering of the reheating furnace involves the quality acceptance of the equipment,pipe(including the accessories),painting and heat insulation.